Yes, the Federal Minister for Climate Change and Energy tweeted some unparalleled cringe about nuclear power, but let’s do something positive with it. — 1. Cost Methodology To reach an uncharitably high pricetag of $5 billion per power plant, the minister multiplied the gross nameplate output of the small modular reactor design specified in work by Nuclear For Climate, i.e. 300 megawatts (or 300,000 kW), with the overnight capital cost number for nuclear supplied by…